Bigelow Hill Intermediate School Improvements
Bigelow Hill Intermediate School
300 Hillcrest Ave.
Student Population – 242 students
Grades 4-5
Building was built in 1969
Building Square footage – 31,645
Site is located on 9.29 Acres
Recent Building Improvements:
Improvement | Category | Year |
Wall Mount Lockable Lunch Tables | Safety | 2004 |
Lighting Upgrade | Energy | 2005 |
Concrete Replacement | Safety | 2005/08 |
Fire Alarm Upgrade | Safety | 2006 |
Public Address System Replacement | Safety | 2006 |
Clock System Replacement | Building Integrity | 2006 |
Asphalt Replacement | Building Integrity/Safety | 2006 |
Masonry Tuck-Point | Building Integrity | 2007 |
Carpet Replacement | Learning Enhancement | 2007 |
Playground Surfacing Upgrade | Safety | 2007 |
Student Desks/Chairs | Learning Enhancement | 2007/08 |
Window and Door Replacement | Building Integrity/Energy/Safety | 2008 |
Asphalt Upgrade | Safety/Building Integrity | 2009 |
Door Replacement | ADA Compliance | 2009 |
Smart Board Installation | Learning Environment Technology | 2009 |
Asphalt Replacement | Building Integrity/Safety | 2010 |
Security Entrance and Cameras | Security/Safety | 2013 |
Playground Surfacing | Safety | 2013 |
Lighting Upgrades (LED) | Energy Savings | 2015 |
Boiler Replacement | Energy Savings | 2015 |
HVAC Controls | Building Integrity/Energy | 2015 |
Air Conditioning | Learning Enhancement | 2016 |
Tuck Pointing | Building Integrity | 2018 |
Building Re-Key | Security | 2018 |
Gym and Stage Flooring Replacement | Building Integrity | 2019 |
Concrete Replacement | Safety | 2019 |